
Day-to-Day Track Maintenance Part II: Switches & Crossings (1952)
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
User rating:
Cast
See More
Storyline
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
Tagline: | |
Certification: | Unknown |
Cast
Directed By
|
C. David Lochner |
Director |
Writing Credits
Production Crew
Edited By
Costume and Makeup
Sound
Visual Effects
Camera
Lighting
Art Department
Other Crew
Reviews & Recommendations
Video Gallery
Coming Soon...
Photo Gallery
Coming Soon...